The FRONT closet project
This one came as a surprise, so its not exactly planned out yet. After applying for a permit to have an electrical upgrade, the technician advised that the panel in the closet would not meet current code. Though they did the work, it was decided that if the non-load bearing closet wasn't supposed to be there, it shouldn't be there, so it is being removed.